The latest confirmed movement, the open question and the next checkpoint.
OPENHighway 210 reconstruction
Highway 210 opened to four lanes between Pine Shores Road and South Sixth Street on October 26, with the roundabouts at County Road 3 and C Street/Highway 25 fully operational. The downtown, bridge and west segments are scheduled for May through November 2027.
Still unresolved: 10th Avenue NE reopening (mid-November), the Gillis Avenue/13th Street SE signal (early December) and the 2027 downtown, bridge and west segments.
Next checkpoint: MnDOT notices on the 10th Avenue NE reopening and the Highway 210 signal installation.
Four lanes opened October 26.
OPENBrainerd 2027 city levy
The City Council set a preliminary maximum levy increase of 9.9%, with possible reductions before final adoption in December.
Still unresolved: The final increase and related budget changes.
Next checkpoint: Budget revisions and the December final levy decision.
Preliminary maximum set September 21.
OPENBaxter 2027 budget and levy
Baxter says it typically holds a public informational meeting on the proposed budget and levy in early December, before final adoption.
Still unresolved: The levy, operating adjustments and enterprise-fund decisions.
Next checkpoint: Published budget figures, the December meeting and final adoption.
OPENUNCONFIRMEDRemaining Brainerd school labor agreements
Not confirmed against the source as of November 4, 2026: all details (the ratified teacher, food-service and interpreter agreements and the still-unsettled educational assistant and nurse agreements), because the source could not be opened. Check the source before relying on it.
The School Board ratified teacher, food-service and interpreter agreements.
Still unresolved: Agreements for educational assistants and nurses, which Brainerd Dispatch reported were still unsettled at the time.
Next checkpoint: Ratification or published terms of the remaining agreements.
Latest movement: September 21.
OPENSchool operating referendum
Brainerd Public Schools' proposal asked voters on Tuesday, November 3 to authorize $5 million annually for 10 years, with funds first available for the 2027-2028 school year. KAXE reported early Wednesday, November 4, that the question failed by several thousand votes in unofficial results. The district has said that without the funding it would have to cut its budget, possibly by closing at least one more school.
Still unresolved: Certified results and the district's budget decisions in response.
Next checkpoint: Official canvass results and School Board action.
AWAITING RECORDSUNCONFIRMEDUtility commission
Not confirmed against the source as of November 4, 2026: the power cost adjustment of $0.010885 per kWh effective with October 2026 billing and the contents of the October 27 packet and draft September 29 minutes (the November 24 meeting date and the lack of posted October 27 minutes are confirmed). Check the source before relying on it.
Draft minutes of the commission's September 29 meeting, included in the packet for its October 27 meeting, show the commission voted to raise the power cost adjustment to $0.010885 per kWh effective with October 2026 billing, among other actions. The October 27 agenda listed those minutes for approval; the outcome of that meeting is not yet posted. The next scheduled meeting is November 24.
Still unresolved: Approval of the September 29 minutes and the actions taken at the October 27 meeting.
Next checkpoint: Approved minutes or another official record of the October 27 meeting, and the November 24 meeting.
OPENSeptember 9 CC’s Bar case
The Brainerd Dispatch reported September 22 that a Brainerd man arrested September 9 after an alleged fight at CC’s Bar was charged with assault and threats. The charges are allegations.
Still unresolved: Later court proceedings and the outcome.
Next checkpoint: A dated court record or further local court report.
Charges reported September 22.
OPENUNCONFIRMEDBrainerd Zipline Tour closure
Not confirmed against the source as of November 4, 2026: all details (that the Brainerd Zipline Tour's 2026 season is its last and that it will close permanently this winter); the cited page no longer mentions it. Check the source before relying on it.
The regional attraction is expected to close permanently this winter.
Still unresolved: The final operating date and future plans for the site or equipment.
Next checkpoint: An operator closing-date or site announcement.
The joint tourism bureau reported that the 2026 season will be the attraction’s last.